[1]邓 佳,王红宇,居文平,等.深度调峰工况下凝结水泵节能优化[J].热力发电,2018,(11):109-114.[doi:10.19666/j.rlfd.201802031]
 DENG Jia,WANG Hongyu,JU Wenping,et al.Energy saving optimization of condensate pump under deep peak load regulation[J].Thermal Power Generation,2018,(11):109-114.[doi:10.19666/j.rlfd.201802031]
点击复制

深度调峰工况下凝结水泵节能优化

参考文献/References:

[1] 张广才, 周科, 鲁芬, 等. 燃煤机组深度调峰技术探讨[J]. 热力发电, 2017, 46(9): 17-23.
ZHANG Guangcai, ZHOU Ke, LU Fen, et al. Discussions on deep peaking technology of coal-fired power plants[J]. Thermal Power Generation, 2017, 46(9): 17-23.
[2] 万杰, 许天宁, 李泽, 等. 热电联产机组抽汽供热期的汽轮机滑压运行优化方法[J]. 节能技术, 2015, 33(1): 33-37.
WAN Jie, XU Tianning, LI Ze, et al. Turbines sliding pressure operation optimization for cogeneration unit during in the period of steam extraction for heating[J]. Energy Conservation Technology, 2015, 33(1): 33-37.
[3] 罗晓明. 300 MW汽轮机变负荷运行热经济性及安全性研究[J]. 汽轮机技术, 2017, 59(5): 385-390.
LUO Xiaoming. Safety and thermal economic analysis on variable load operation of 300 MW steam turbine[J]. Turbine Technology, 2017, 59(5): 385-390.
[4] 张希富, 王运民, 师保平, 等. 电厂汽轮机组变负荷运行安全经济性分析[J]. 汽轮机技术, 2014, 56(6):464-466.
ZHANG Xifu, WANG Yunmin, SHI Baoping, et al. Safety and economic analysis on variable load operation of steam turbine unit in power plant[J]. Turbine Technology, 2014, 56(6): 464-466.
[5] 曹剑锋. 凝结水泵节能优化改造[D]. 北京: 华北电力大学, 2012: 1-4.
CAO Jianfeng. Energy saving optimizing renovation for condensation pump[D]. Beijing: North China Electric Power University, 2012: 1-4.
[6] 温新宇. 大型火电机组凝结水泵变频技术深度节能策略研究[J]. 汽轮机技术, 2016, 58(2): 146-148.
WEN Xinyu. Research on deep energy-saving strategies of condensate pump frequency technology in large thermal power units[J]. Turbine Technology, 2016, 58(2): 146-148.
[7] 梅德奇, 张福仲. 亚临界600 MW空冷机组凝结水泵变频改造[J]. 热力发电, 2013, 42(1): 103-104.
MEI Deqi, ZHANG Fuzhong. Frequency conversion transformation of condensate pump for a 600 MW subcritical air-cooled unit[J]. Thermal Power Generation, 2013, 42(1): 103-104.
[8] 高俊如, 候昭毅, 刘启亮. 菏泽电厂深度调峰运行机组安全经济性分析及改进措施[J]. 热力发电, 2009, 38(10): 48-49.
GAO Junru, HOU Zhaoyi, LIU Qiliang. Safety and economic analysis of units used for deep peak-regulating operation in Heze Power Plant and retrofit measures thereof[J]. Thermal Power Generation, 2009, 38(10):48-49.
[9] 李泉, 尹峰, 苏烨, 等. 超临界机组深度调峰研究及应用[J]. 电站系统工程, 2017, 33(5): 60-66.
LI Quan, YIN Feng, SU Ye, et al. Research and application of supercritical unit on peak load[J]. Power System Engineering, 2017, 33(5): 60-66.
[10] 张希富. 火电厂大型汽轮机变负荷运行能耗分析与优化[D]. 长沙: 长沙理工大学, 2014: 7-18.
ZHANG Xifu. Analysis of energy less and optimization on variable load operation of large steam turbine in thermal power plant[D]. Changsha: Changsha University of Science and Technology, 2014: 7-18.
[11] 范鑫, 秦建明, 刘静宇, 等. 超临界600 MW汽轮机低负荷运行优化技术研究[J]. 中国电力, 2012, 45(11): 18-21.
FAN Xin, QIN Jianming, LIU Jingyu, et al. Study on optimization of low load operation for supercritical600 MW steam turbines[J]. Electric Power, 2012, 45(11): 18-21.
[12] 邓山, 李健平, 吕海涛, 等. 火电机组低负荷下主要节能潜力探讨[J]. 中国电力, 2017, 50(3): 83-87.
DENG Shan, LI Jianping, LV Haitao, et al. Discussion on main energy saving potential under low loads of thermal power unit[J]. Electric Power, 2017, 50(3): 83-87.
[13] 姜延灿, 邓彤天, 张颖, 等. 600 MW火电机组低负荷调峰的经济运行方式分析[J]. 汽轮机技术, 2015, 57(1): 61-64.
JIANG Yancan, DENG Tongtian, ZHANG Ying, et al. Analysis on economic operation mode of 600 MW fossil-fired generating during peak shaving low load operation[J]. Turbine Technology, 2015, 57(1): 61-64.
[14] 戈志华, 孙诗梦, 万燕, 等. 大型汽轮机组高背压供热改造适用性分析[J]. 中国电机工程学报, 2017, 37(11): 3216-3222.
GE Zhihua, SUN Shimeng, WAN Yan, et al. Applicability analysis of high back-pressure heating retrofit for large-scale steam turbine unit[J]. Proceedings of the CSEE, 2017, 37(11): 3216-3222.
[15] 付亦葳, 马汀山, 刘永林. 基于EBSILON 的蒸汽冷却器节能效果评估[J]. 热力发电, 2017, 46(3): 14-18.
FU Yiwei, MA Tingshan, LIU Yonglin. An EBSILON-based evaluation method for energy saving of steam cooler[J]. Thermal Power Generation, 2017, 46(3): 14-18.
[16] 邓伟, 张燕平. 某600 MW凝汽机组供热改造方案热经济性分析[J]. 广东电力, 2018, 31(1): 25-29.
DENG Wei, ZHANG Yanping. Analysis on economy of heat supply reconstruction scheme for 600 MW con- densing unit[J]. Guangdong Electric Power, 2018, 31(1): 25-29.
(责任编辑 马昕红)

相似文献/References:

[1]李建波,陈 东.2×330 MW机组凝结水泵变频改造[J].热力发电,2009,(08):113.
 ZHOU Jian,YAN Wei-ping,SHI Li-guo,et al.FREQUENCY- VARYING RETROFIT OF ELECTRIC MOTORS USED FOR CONDENSATE PUMPS OF 2×330 MW UNITS[J].Thermal Power Generation,2009,(11):113.
[2]李科文,王 新.国产300 MW机组凝结水系统节能改造及经济性分析[J].热力发电,2010,(04):52.
 LI Kewen,WANG Xin.ENERGY[CDF*2]SAVING RETROFIT OF THE CONDASATE SYSTEM FOR HOME[CDF*2]MADE 300 MW UNITS AND ECONOMIC EFFICIENY ANALYSIS THEREOF[J].Thermal Power Generation,2010,(11):52.
[3]何新玲.变频、变极技术应用于汽轮机辅机调速改造[J].热力发电,2010,(06):94.
 HE Xinling.APPLICATION OF FREQUENCY CONVERSION TECHNOLOGY INTO SPEED ADJUSTABLE RETROFIT OF AUXILIRY EQUIPMENTS FOR STEAM TURBINES[J].Thermal Power Generation,2010,(11):94.
[4]熊康军.华豫电厂凝结水泵变频改造[J].热力发电,2008,(08):57.
[5]刘广忱,杨德荣,张英贤.基于中压变频技术的600 MW机组凝结水泵的节能改造[J].热力发电,2008,(08):62.
[6]周 达.300 MW机组起动过程实现凝结水泵、循环水泵、电动给水泵零单耗[J].热力发电,2008,(07):55.
[7]盛喜兵,李振强,杜化仲,等.330 MW机组凝结水泵变频改造及系统运行优化[J].热力发电,2011,(09):86.
 SHENG Xibing,LI Zhenqiang,DU Huazhong,et al.FREQUENCY CONVERSION RETROFIT OF CONDENSATE PUMP FOR 330 MW UNIT AND SYSTEM OPEATION OPTIMIZATION THEREOF[J].Thermal Power Generation,2011,(11):86.
[8]赵国钦,黄妙庄.超临界600 MW机组凝结水泵设计选型分析[J].热力发电,2012,(12):58.
 ZHAO Guoqin,HUANG Miaozhuang.DESIGN AND TYPE SELECTION OF CONDENSATE PUMP FOR A SUPERCRITICAL 600 MW UNIT[J].Thermal Power Generation,2012,(11):58.
[9]庞华豪.湛江发电厂凝结水泵存在问题的分析及处理[J].热力发电,2003,(01):0.
[10]李 俊,李建河,黄莉莉.凝结水泵加装高压变频器出现的问题及解决方案[J].热力发电,2008,(12):96.

备注/Memo

邓佳(1990—),女,硕士,工程师,主要研究方向为汽轮机和辅机节能诊断以及优化技术,dengjia@tpri.com.cn。

更新日期/Last Update: 2018-10-25