[1]何干祥,井新经,张海龙,等.燃煤机组气力除灰系统能耗评估及节能优化[J].热力发电,2018,(11):18-23.[doi:10.19666/j.rlfd.201803115]
 HE Ganxiang,JING Xinjing,ZHANG Hailong,et al.Energy consumption evaluation and energy conservation optimization for pneumatic ash disposal system of coal-fired units[J].Thermal Power Generation,2018,(11):18-23.[doi:10.19666/j.rlfd.201803115]
点击复制

燃煤机组气力除灰系统能耗评估及节能优化

参考文献/References:

[1] 邝伟, 陈建斌, 江建忠, 等. 300 MW循环流化床锅炉气力输灰系统存在问题及改造方案[J]. 热力发电, 2009, 38(2): 45-47.
KUANG Wei, CHEN Jianbin, JIANG Jianzhong, et al. Problems existing in pneumatic ash convering system of 300 MW CFB boiler and retrofit scheme thereof[J]. Thermal Power Generation, 2009, 38(2): 45-47.
[2] 龙健. 600 MW超临界机组气力输灰系统问题分析及处理[J]. 广西电力, 2010, 33(2): 63-65.
LONG Jian. Problem analysis and treatment of pneumatic flying ash transmission system in 600MW super critical unit[J]. Guangxi Electric Power, 2010, 33(2): 63-65.
[3] 苏富强, 蒋闻文, 郭亮, 等. 基于稳定输送流场的正压浓相气力输灰系统研究及应用[J]. 华电技术, 2010, 32(2): 1-3.
SU Fuqiang, JIANG Wenwen, GUO Liang, et al. Research and application of positive pressure dense phase ash pneumatic conveying system based on stable transport flow field[J]. Huadian Technology, 2010, 32(2): 1-3.
[4] 张瑞峰. 正压浓相气力输灰系统改造分析[J]. 山西焦煤科技, 2011, 35(3): 4-7.
ZHANG Ruifeng. Transformation analysis of pneumatic conveying system[J]. Shanxi Coking Coal Science & Technology, 2011, 35(3): 4-7.
[5] 李庆, 王岳, 段文伟. 燃煤电厂干除灰输送系统的运行现状分析[J]. 华北电力技术, 2006(10): 49-51.
LI Qing, WANG Yue, DUAN Wenwei. Analysis on operation status of dry ash conveying system in coal-fired power plant[J]. North China Electric Power, 2006(10): 49-51.
[6] 桑愈. 火电厂气力输灰系统节能运行关键技术研究[D]. 南通: 南通大学, 2016: 19.
SANG Yu. Energy saving research of thermal power plant pneumatic ash conveying system[D]. Nantong: Nantong University, 2016: 19.
[7] 林朝扶, 凌浩翔. 火电厂气力输灰技术[J]. 广西电力, 2003, 27(3): 80-83.
LIN Chaofu, LING Haoxiang. Pneumatic ash conveying technology in thermal power plant[J]. Guangxi Electric Power, 2003, 27(3): 80-83.
[8] 万承军. 气力输灰系统中灰气比参数的选取[J]. 粉煤灰, 2014, 26(2): 13-14.
WAN Chengjun. Probe into selection of ash/air ratio parameter in pneumatic ash conveying system[J]. Coal Ash, 2014, 26(2): 13-14.
[9] 孔凡荣. 火电厂除尘器灰斗输灰系统节能降耗技术探究[J]. 现代工业经济和信息化, 2014, 4(19): 82-84.
KONG Fanrong. Thermal power plant precipitator ash hopper system energy saving technology[J]. Modern Industrial Economy and Informationization, 2014, 4(19): 82-84.
[10] 刘军峰. 大型火电机组输灰系统运行优化探讨[J]. 河南电力技术, 2016(9): 13-15.
LIU Junfeng. Discussion on operation optimization of ash transport system in large thermal power units[J]. Henan Electric Power Technology, 2016(9): 13-15.
[11] 陈刚. 配煤掺烧工况下的除灰系统优化[J]. 电力与能源, 2013, 34(1): 94-96.
CHEN Gang. Optimization of ash handling system of 300MW units under coal blending mixed burning operating condition[J]. Power & Energy, 2013, 34(1): 94-96.
[12] 林江, 楼建勇, 骆章. 正压浓相气力输送系统输送特性的实验研究[J]. 浙江科技学院学报, 2008(2): 93-97.
LIN Jiang, LOU Jianyong, LUO Zhang. Experimental study on the conveying characteristics of the dense pneumatic conveying system[J]. Journal of Zhejiang University of Science and Technology, 2008(2): 93-97.
[13] 冯俊凯, 沈幼庭, 杨瑞昌. 锅炉原理及计算[M]. 3版. 北京: 中国科学出版社, 2003: 357-367.
FENG Junkai, SHEN Youting, YANG Ruichang. Boiler principle and calculation[M]. 3rd ed. Beijing: China Science Press, 2003: 357-367.
[14] 国家电力公司西北电力设计院, 电力行业电力规划设计标准化技术委员会. 火力发电厂除灰设计技术规程: DL/T 5142—2012[S]. 北京: 中国计划出版社, 2012.
Northwest Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group, Power Industry Planning and Design Standardization Technical Committee. Technical code for the design of ash handing system of fossil-fired power plant: DL/T 5142—2012[S]. Beijing: China Plans Publishing House, 2012.
[15] 张海龙. 神华国华孟津发电有限责任公司2号机组能耗诊断节能优化试验报告[R]. 西安: 西安热工研究院有限公司, 2017: 41-48.
ZHANG Hailong. Energy-saving diagnosis of energy-saving test report for No.2 unit of Shenhua Guohua Mengjin Power Generation Co., Ltd.[R]. Xi’an: Xi’an Thermal Power Research Institute Co., Ltd., 2017: 41-48.
[16] 陈卓卫, 孙超凡, 洪喜彬, 等. 300 MW循环流化床锅炉改烧低灰分褐煤试验研究[J]. 广东电力, 2016, 29(1): 17-21.
CHEN Zhuowei, SUN Chaofan, HONG Xibin, et al. Experimental research on 300 MW circulating fluidized bed boiler changing to burn low ash content lignite[J]. Guangdong Electric Power, 2016, 29(1): 17-21.
[17] 陈洪博, 白向飞, 罗陨飞. 煤的发热量与水分、灰分的关系研究[J]. 煤质技术, 2010(4): 26-28.
CHEN Hongbo, BAI Xiangfei, LUO Yunfei. Study on correlation between calorific value and moisture and ash yield of coal[J]. Coal Quality Technology, 2010(4): 26-28.
[18] 冯桂东. 用回归方法研究煤的灰分、水分与发热量的关系[J]. 江苏煤炭, 2001(1): 33-35.
FENG Guidong. Study on relations between ash, moisture and calorific value of coal with regression method[J]. Jiangsu Coal, 2001(1): 33-35.
(责任编辑 杨嘉蕾)

相似文献/References:

[1]邝 伟,陈建斌,江建忠,等.300 MW循环流化床锅炉气力输灰系统存在问题及改造方案[J].热力发电,2009,(02):0.

备注/Memo

何干祥(1972—),男,工程师,主要研究方向为火电厂节能优化运行技术,916700451@qq.com。

更新日期/Last Update: 2018-10-25